SAN JOSE, Calif. — November 16, 2026. A major upgrade to the San José–Santa Clara Regional Wastewater Facility will go before San Jose City Council on November 17. City staff are asking approval of an $11,248,000 construction contract with Blocka Construction Inc. for the facility’s HVAC Improvements Phase 1 Re-Bid Project.
A project with a separate contingency
The recommendation also requests a 15% construction contingency of $1,687,200. If the council approves both amounts, the combined construction award and available contingency would total $12,935,200. That is the contract amount plus authorized contingency—not proof that all contingency funds will be spent.
The agenda describes the contractor as the lowest responsive, responsible bidder after a re-bid process. The City Council is also asked to accept an environmental-review addendum to the San José–Santa Clara Water Pollution Control Plant Master Plan Final Environmental Impact Report, originally adopted in 2013, and the related mitigation monitoring program. Environmental review and contracting are distinct decisions, both described in this agenda item.
Why ventilation matters at a treatment plant
Wastewater facilities use mechanical and electrical systems in demanding conditions. Heating, ventilation and air-conditioning improvements can be important for the facility’s equipment and personnel. The official agenda identifies the project but does not establish the specific rooms, equipment failures, operating savings or construction start date in the public-facing summary; those details must be checked against the project’s memorandum and specifications.
What residents should watch
Residents can ask whether the re-bid changed costs or design, how the environmental findings address construction impacts, which milestones control contractor payments and how the facility will keep operating during the work. A high contract ceiling should not be confused with money already paid.
The matter appears as Item 6.1 at the regular council session scheduled for 1:30 p.m. Tuesday, November 17. The item has not yet been reported as approved in the city’s official record.
Primary source: San José City Council, File 26-1195, November 17 agenda.
Support San Jose News
Choose how to support San Jose News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “San Jose News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from San Jose News
- San Jose Proposes Doubling Cornerstone Earth Environmental Consulting Contract Ceiling to $2 Million →
- San Jose Fuel Supply Proposal Would Raise Purchase Ceiling to $7.13 Million, Plus $1.4 Million Contingency →
- San Jose Council Agenda Lists Proposed $180,000 Settlement in Lopez Federal Lawsuit →
- San Jose Zoning Proposal Would Change Fire-Zone Tree Rules, ADU Standards and Public Notice Deadlines →
- How to Find Russian-Speaking Tax Help in San Jose for the 2027 Filing Season →

COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.